In this project, we gutted the bathroom and converted the tub shower to a full tile stand-up shower. We did the same tile in the niche, the top of the bench, and the shower pan for a uniform look. Custom cabinetry was added for the linen storage and a new vanity with a quartz top was done. Tile flooring with a tile base was installed.